Design reliability in — before construction makes it expensive to fix.
Review new projects so reliability, maintainability, and operability are designed in — early, rather than retrofitted later.
Reliability problems built into a design are an order of magnitude more expensive to fix after construction.
During FEL phases, design reviews, procurement, and pre-startup readiness.
PI performs design-for-reliability reviews and challenges design assumptions before they harden into constructed reality.